June 20, 2022 6:21 PM

views 1

PLI Scheme for Telecom & Networking Products amended with additional incentive rates

The Guidelines for the  Production linked incentive (PLI) Scheme for Telecom and Networking Products have been amended to introduce the Design-led Manufacturing with additional incentive rates.The PLI Scheme has been amended to facilitate Design-Led Manufacturing with additional incentive rate of one percent over and above existing incentive rates. Communications Ministry said in a release that this was done after consultations with stakeholders.   The Union Budget 2022-23 has proposed to launch...