May 20, 2019 12:46 PM

printer

Maharashtra stares at power crisis as Koyna water level dips

<span style="color: #222222;">Maharashtra is likely to face power shortage due to depleted water stock in the Koyna dam, which generates 1000 MW in the fourth phase of Koyna hydroelectric project.<br />'' <br />'' With the total capacity of 105 TMC, the current stock at the dam is only 28 TMC. <br />'' <br />''With this storage, only nine TMC will be available for the fourth phase, which will be sufficient only for a few days.</span><br />

Most Read
View All arrow-right

No posts found.