December 8, 2022 1:38 PM

printer

Kudankulam Nuclear Power Plant likely to reach its full capacity of 6000 megawatt by 2027

<span style="color: #222222;">Kudankulam Nuclear Power Plant is expected to reach its full capacity of six thousand megawatt by 2027. Currently, Unit 1 and 2 of the plant having 1000 megawatt capacity each are in operation, while the remaining four units with the capacity of 1000 megawatt each are under construction. This was stated by the Minister of State in Prime Minsiter's officer Dr. Jitendra Singh in a written reply in the Rajya Sabha today.</span><br />

Most Read
View All arrow-right

No posts found.