<p style="margin: 0px; text-align: justify;">In Jammu and Kashmir, the Administrative Council (AC), under the chairmanship of Lieutenant Governor, Manoj Sinha today approved the installation of 200 MW of grid-tied rooftop solar power plants under the &quot;Solar City Mission&quot; in Jammu City.&nbsp;</p>''<p style="margin: 0px; text-align: justify;"><br />''</p>''<p style="margin: 0px; text-align: justify;">AIR Correspondent reports that the decision has been taken to implement the Government of India's Grid-connected Rooftop Solar Scheme, Phase-II for the residential sector in J&amp;K to ensure that the electricity needs of the city are fully met from solar energy. Under the project, 200 MW grid-tied rooftop solar power plants will be installed on 50 thousand residential buildings in Jammu city by Jammu and Kashmir Energy Development Agency (JAKEDA) under its &quot;Solar City Mission&quot; at an estimated cost of Rs 1040 crore.&nbsp;</p>''<p style="margin: 0px; text-align: justify;"><br />''</p>''<p style="margin: 0px; text-align: justify;">The project will be completed by March 2024 and will have a lifetime of 25 years. The Central Sector Scheme provides a central subsidy component of 40 per cent of the project cost and a state subsidy component of 25 per cent of the project cost for the installation of solar power panels, below 3 KW capacity, beyond which the central subsidy component remains at 20 per cent. The subsidy will be provided to the beneficiaries through DBT mode.</p>''<p style="margin: 0px; text-align: justify;"><br />''</p>
News On AIR | June 11, 2022 4:28 PM
J&K LG approves installation of 200 MW of grid-tied rooftop solar power plants under "Solar City Mission" in Jammu city