December 21, 2022 8:39 PM

printer

Gujarat: Ambassador of Japan to India Hiroshi F. Suzuki appreciates ongoing construction work being done on Mumbai-Ahmedabad High-Speed Corridor

<span style="color: #222222;">In Gujarat, Ambassador of Japan to India Hiroshi F. Suzuki, along with Managing Director of National High-Speed Rail Corridor Limited NHSRCL Rajendra Prasad visited the under-construction Surat high Speed Railway station, casting yards at Surat and Navsari district and Purna River today.<br />''<br />''Mr. Hiroshi Suzuki appreciated the ongoing construction work being done on Mumbai-Ahmedabad High-Speed Corridor in Gujarat.     <br />''<br />''Managing Director of NHSRCL Rajendra Prasad told that 98.87 percent land has been acquired in Gujarat for the project. All the civil works including the construction of High-Speed stations, bridges and tracks have been allotted in the State. Mr. Prasad said, the first trial of the bullet train will be held on the Surat-Bilimora corridor by June 2026.<br />''<br />''Our correspondent reports that Gujarat will have 8 out of the total 12 high-speed railway stations to be constructed on this corridor.</span><br />

Most Read
View All arrow-right

No posts found.