The Government has set a target of installation of 100 GigaWatt solar power and 60 GigaWatt wind power capacity in the country by December 2022 by implementing various schemes. <br />''<br />''In a written reply in the Lok Sabha, Energy Minister R K Singh said, majority of solar power projects are installed with private investments. He added that Grid connected solar power capacity of over 33 thousand seven hundred megawatt has been installed in the country till 31st December last year. Mr. Singh said, over 37 thousand five hundred megawatt of wind power was also installed till the end of last year.<br />''<br />''<br />
News On AIR | February 6, 2020 2:28 PM
Govt has set target of installation of 100 GigaWatt solar power by Dec 2022