October 6, 2022 2:07 PM

printer

Commercial operations of North-South Corridor of Ahmedabad Metro, Gujarat to begin today

<span style="color: #222222;">The commercial operations of the North-South Corridor of Ahmedabad Metro began today, October 6. The 18 Kilometer North-South Corridor connects APMC, Vasana in the South to Moteta in the north. This will be the second corridor of Phase 1 of the project that was opened for passenger travel this month.<br />''</span><br />''Phase 1 of Ahmedabad Metro, which consists of East-West and North-South corridors, was inaugurated by Prime Minister Narendra Modi on September 30.<br />''<br />''<span style="color: #222222;">The line which is completely elevated will be passing through Sabarmati, AEC, Sabarmati Railway station, Ranip, Vadaj, Vijaynagar, Usmanpura, Old High court, Gandhigram, Paldi, Shreyas, Rajivnagar, and Jivraj stations.</span><br />

Most Read
View All arrow-right

No posts found.